3rd Day IT : 7th April 2010

1. My third day in the company finally arrived.

2. I walked in and punched the card with ne confidence and courage.

3. I have endured the 1st 2 days with quite ease, as the real challenge hasn’t yet walked in.

4. For today, I just continued what I have been assigned earlier, which is to review the drawings, but this time I’m putting it in report.



My desk condition while completing the report.

5. This is what I did for the whole day till about 5.30 pm, Miss Suhaila gave me a new assignment.

6. She asked me to read through a document titled ‘EPCC & Maintenance of Double Track Project Between Seremban & Gemas – AC Interference Study on Underground Petronas Gas Pipeline at Crossing Points’.

7. The document was quite thick, but I just said OK anyways.

8. It’s about the of AC current that would affect the metal pipeline owned by Petronas.

9. After making a copy of the document for myself, I clocked out at 6 pm later in the day.

10. Another day bites the dust…